Driving Range Lighting Guide: Design, Poles & Cost

A driving-range lighting proposal should show where the light goes, how glare and spill are controlled, and what the complete project includes. Fixture wattage or a national price-per-pole estimate is not enough to specify a safe, usable range.

Content reviewed 2 November 2026

In this guide
  1. Start with the site and operating hours
  2. What a useful lighting proposal contains
  3. Separate equipment from installed cost
  4. Coordinate lighting with the range
  5. Prepare a useful enquiry

Start with the site and operating hours

  • Provide the range’s length, width, hitting-bay position and a measured site plan.
  • Identify the ball-flight area, landing zones, targets, walkways and maintenance access.
  • Record operating hours, existing poles and electrical service.
  • Mark neighboring properties, roads and any planning or environmental constraints.
  • Confirm whether the project replaces fixtures on existing supports or builds a new system.

What a useful lighting proposal contains

Deliverable Why it matters
Photometric layout Shows predicted illumination distribution across the intended areas
Fixture schedule and aiming plan Defines exact optics, output, quantity and aiming
Mounting heights and pole locations Connects lighting geometry to the physical site
Glare and spill-light review Addresses players, neighbors and surrounding roads
Electrical load and controls Defines power needs, switching, schedules and control zones
Maintenance and commissioning scope Explains access, testing, adjustment and ongoing upkeep

These are documents to request from the appointed lighting supplier/designer. Their inclusion and any engineering or installation work must be expressly confirmed in the project quote.

Separate equipment from installed cost

Budget item Confirm in the quote
Fixtures and controls Exact model, optics, quantity, warranty and controls
Poles and foundations New versus reused supports, structural checks and ground conditions
Electrical work Supply capacity, distribution, trenching, cabling and qualified labor
Access and installation Lifting equipment, working access and installation responsibility
Approvals and commissioning Local requirements, testing, final aiming and handover

Replacement fixtures on suitable existing poles and a new range with poles, foundations and trenching are different projects. A single unsourced installed-price range can mislead. Ask for an itemised site-specific proposal rather than extrapolating from fixture prices.

Coordinate lighting with the range

Keep poles and equipment compatible with netting supports and containment, maintenance routes and the ball-picking pattern. Plan access so routine cleaning, aiming and repairs do not require avoidable disruption to the range.

Prepare a useful enquiry

Send the site plan, dimensions, photographs, opening hours, existing fixture/pole information, available electrical details and delivery location. State the areas that need lighting and the project timeline. Confirm who supplies design, structural work, electrical work, installation and commissioning before accepting a total.

Share the site and operating requirements to establish the equipment and design scope.

Discuss a range-lighting project